Hardware overview
The storage system consists of a controller chassis and one or more drive chassis mounted in a 19-inch rack.
Controller chassis
The controller chassis contains the following components:
- Controller boards (CTLs, also called DKCs.)
- Front-end modules (FEMs), also called channel boards (CHBs)
- Power supply (PS)NoteThe PSUT power supply has a Titanium efficiency rating.
- Backup fan module (BKMF)
The CTLs contain the cache memory (CM) and cache flash memory (CFM) for the storage system. The VSP E590 and VSP E790 support up to 768 GiB of cache memory.
Number | Item | Description |
1 | LED (POWER, READY, WARNING, ALARM) | Status LEDs for the controller chassis. |
2 | POWER ON/OFF (main switch) |
Switch that controls power to the storage system. |
3 | Lock | Use to lock and unlock front bezel. |
Number | Item | Description |
1 | POWER LED | Green: Storage system is powered on. Amber: Storage system is receiving power. |
2 | READY LED | Green: Normal operation. |
3 | WARNING LED | Off: Normal operation. Amber: Component requires maintenance. Blink: Failure requires maintenance. Note: When system option mode (SOM) 1097 is set to ON, the WARNING LED does not blink, even if the following failure service information messages (SIMs) are issued: 452xxx, 462xxx, 3077xx, 4100xx, and 410100. LED might turn off during user maintenance. |
4 | ALARM LED | Off: Normal operation. Red: Processor failure (system might be down). For assistance, contact customer support: https://support.hitachivantara.com/en_us/contact-us.html. |
Number | Item | Description |
1 | LED (POWER, READY, WARNING, ALARM) | Status LEDs for the controller chassis. |
2 | ALM LED | Red: Drives can be replaced. |
3 | ACT LED | Green: Normal operation. Green Blinking: The drive is being accessed. |
4 | Drives | Disk drives |
Number | Item | Description |
1 | Power supply unit | Supplies electric power to the controller components. |
2 | Controllers | Controller 1 (bottom) and Controller 2 (Top) |
Number | Item | Description |
1 | RDY LED | On: Normal Operation |
2 | MAINT LED | On: Power supply unit can be replaced. |
Controller board
Number | Item | Description |
1 | Channel board | Channel board component |
2 | LAN-RST switch | Resets GUM. Use only when instructed by Hitachi Vantara support. |
3 | LAN port |
LAN1: Maintenance LAN port (left) LAN2: User LAN port (right) |
4 |
Uninterruptible power supply port | NA |
5 | Cache flash memory | NA |
Number | Item | Description |
1 | BACKUP STS LED |
|
2 | CTL ALM LED |
|
3 | ALARM LED (for CFM ) | Red: Cache flash memory can be removed. |
Front-end modules
The front-end modules (FEMs), also called channel boards (CHBs), control the transfer of data between the host and cache memory. The storage system supports Fibre Channel (FC) and iSCSI front-end modules (FEMs) for attachment to host servers. The front-end module LEDs indicate the operating status of the module.
Specification | Fibre 32-Gbps Ready | iSCSI 10G | iSCSI 10G BASE-T | |
Model number | DW-F900-4HF32R | DW-F900-2HS10S | DW-F900-2HS10B | |
Number of PCBs | 1 | 1 | 1 | |
Host interface | FCP | iSCSI (optical) | iSCSI (copper) | |
Data transfer rate (MB/s) | 16 Gbps: 400/800/1,600 32 Gbps: 800/1,600/3,200 | 1,000 | 100/1,000 | |
Number of options installed( ): DKB slot used | 2/4/6/ | 2/4/6 | 2/4/6 | |
Number of ports per PCB | 4 | 2 | 2 | |
Number of ports per storage system( ): DKB slot used | 8/16/24 | 4/8/12 | 4/8/12 | |
Maximum cable length | Short wave1 | 400 m/190 m/125 m/100 m | 550 m | - |
Long wave | 10 km | - | - | |
Copper | - | - | 50m (cat 6a) | |
|
10-Gbps iSCSI board LEDs and connectors (optical)
Number | Item | Description |
1 | STATUS LED | Green: Front-end module is in the
power-on state. Red: Front-end module can be removed safely. |
2 | PORT LED | Red: Small form-factor (SFF) pluggable
can be removed. Blue: Normal link status. Blink blue: Front-end module is in communication status. |
3 | iSCSI connectors | Connect to Ethernet cables. |
CHB number | Port 1 | Port 2 |
CHB-1A | 1A | 3A |
CHB-1B | 1B | 3B |
CHB-1C | 1C | 3C |
CHB-2A | 2A | 4A |
CHB-2B | 2B | 4B |
CHB-2C | 2C | 4C |
10-Gbps iSCSI board LEDs and connectors (copper)
Number | Item | Description |
1 | STATUS LED | Green: Front-end module is in the
power-on state. Red: Front-end module can be removed safely. |
2 | iSCSI connectors | Connect to Ethernet cables. |
3 | PORT (Link/Speed) LED | Yellow: 1-Gbps link. Green: 10-Gbps link. Off: No link connection. |
4 | PORT (Act) LED | Green: Link connection is
established. Blinking: Communication is in progress. Off: No link connection or not ready to communicate. |
CHB number | Port 1 | Port 2 |
CHB-1A | 1A | 3A |
CHB-1B | 1B | 3B |
CHB-1C | 1C | 3C |
CHB-2A | 2A | 4A |
CHB-2B | 2B | 4B |
CHB-2C | 2C | 4C |
8-Gbps, 16-Gbps, or 32-Gbps Fibre Channel (4-port) board LEDs and connectors
Number | Item | Description |
1 | STATUS LED | Green: Front-end module is in
power-on state. Red: Front-end module can be removed safely. |
2 | PORT LED | Red: Small-form factor (SFF)
pluggable can be removed. Blue: Normal link status at 16 Gbps (16 Gbps). Blue: Normal link status at 32 Gbps (32 Gbps). Green: Normal link status at 4 Gbps or 8 Gbps (16 Gbps). Green: Normal link status at 8 Gbps or 16 Gbps (32 Gbps). |
3 | Fibre Channel connectors | Connect to Fibre Channel cables. |
The following table lists the Fibre Channel port assignments
CHB number | 8-Gbps, 16-Gbps, or 32-Gbps Fibre Channel ports (left to right) | |||
Port 1 | Port 2 | Port 3 | Port 4 | |
CHB-1A | 1A | 3A | 5A | 7A |
CHB-1B | 1B | 3B | 5B | 7B |
CHB-1C | 1C | 3C | 5C | 7C |
CHB-2A | 2A | 4A | 6A | 8A |
CHB-2B | 2B | 4B | 6B | 8B |
CHB-2C | 2C | 4C | 6C | 8C |
LAN blade LEDs and connectors
Number | Item | Description |
1 | LINK LED | Green: Link status is normal. |
2 | ACT LED | Orange: Data is being transferred. |
3 | LAN 2 | LAN port used by the user. |
4 | LAN 1 | Maintenance LAN port used by service personnel. |
5 | LAN ALARM LED | Red: LAN blade can be removed. |
6 | Uninterruptible power supply (UPS) port | N/A |
Small-form-factor drive tray (DBS)
The following table describes the physical specifications of the small-form-factor drive tray.
Name |
Model name |
Height |
Number of drive slots |
Drive type |
DBS |
DW-F1000-DBS |
2U (88.2 mm) |
24 |
2.5 inch (SFF) |
DBSE |
DW-F1000-DBSE |
2U (88.2 mm) |
24 |
2.5 inch (SFF) |
SFF front panel with bezel
Number | Item | Description |
1 | POWER LED |
Green: Drive tray is powered on. |
2 | READY LED |
Green: Drive tray is operational. |
3 | Locate LED |
Amber:
|
4 | Lock |
Locks and unlocks the front panel bezel by using the supplied key. |
SFF front panel without bezel
Number | Item | Description |
1 |
POWER, READY, and LOCATE LEDs |
Green: Drive tray is powered on. |
Green: Drive tray is operational. | ||
Amber:
| ||
2 |
ALM LED | Red: Drive stopped due to a failure and can be replaced. |
3 |
ACT LED |
Green: Normal operation. Blink green: Drive is being accessed. |
4 | Small-form-factor drives |
The twenty-four 2.5-inch SFF drives are positioned vertically. The slots are organized from 0 to 23. |
SFF rear panel
Number | Item | Description |
1 | ENC | N/A |
2 | POWER LED |
Green: ENC is in the power-on state. |
3 | Locate LED |
Amber:
|
4 | ALARM LED |
Red: ENC can be replaced. |
5 | PATH (IN) LED |
Blue: IN side port is linked up. |
6 | PATH (IN) connector |
Connects to a controller or drive tray. |
7 | PATH (OUT) LED |
Blue: OUT side port is linked up. |
8 | PATH (OUT) connector |
Connects to a drive tray. |
9 | Console |
This port is reserved. |
10 | Power supply unit | N/A |
11 | Receptacle |
Connects to the power cable provided with the storage system. |
12 | AC IN LED |
Green: Normal operation. |
13 | ALM LED |
Red: Power supply unit can be replaced. |
14 | RDY LED |
Green: Normal operation. |
AC power supply unit LEDs and connectors
Both SFF and LFF drive trays are equipped with AC power supply units. The AC power supply units include LEDs to display their operating status.
Number | Item | Description |
1 | RDY LED |
Green: Normal operation. |
2 | ACI IN LED |
Green: AC input is operating normally. |
3 | ALM LED |
Red: Power supply unit can be replaced. |
Small-form-factor drive tray (DBS2)
The following table describes the physical specifications of the small-form-factor drive tray.
Name |
Model name |
Height |
Number of drive slots |
Drive type |
DBS2 |
DW-F1000-DBS2 |
2U (88.2 mm) |
24 |
2.5 inch (SFF) |
DBS2E |
DW-F1000-DBS2E |
2U (88.2 mm) |
24 |
2.5 inch (SFF) |
SFF front panel with bezel
Number | Item | Description |
1 | POWER LED |
Green: Drive tray is powered on. |
2 | READY LED |
Green: Drive tray is operational. |
3 | Locate LED |
Amber:
|
4 | Lock |
Locks and unlocks the front panel bezel by using the supplied key. |
SFF front panel without bezel
Number | Item | Description |
1 |
POWER, READY, and LOCATE LEDs |
Green: Drive tray is powered on. |
Green: Drive tray is operational. | ||
Amber:
| ||
2 |
ALM LED | Red: Drive stopped due to a failure and can be replaced. |
3 |
ACT LED |
Green: Normal operation. Blink green: Drive is being accessed. |
4 | Small-form-factor drives |
The twenty-four 2.5-inch SFF drives are positioned vertically. The slots are organized from 0 to 23. |
SFF rear panel
Number | Item | Description |
1 | PATH (IN) connector |
Connects to a controller or drive tray. |
2 | PATH (OUT) connector |
Connects to a drive tray. |
3 | ENC | N/A |
4 | PATH (IN) LED |
Blue: IN side port is linked up. |
5 | PATH (OUT) LED |
Blue: OUT side port is linked up. |
6 | Console |
These ports are reserved. |
7 | POWER LED |
Green: ENC is in the power-on state. |
8 | LOCATE LED |
Amber:
|
9 | ALARM LED | Red: ENC can be replaced. |
10 | Power supply unit | N/A |
11 | Receptacle |
Connects to the power cable provided with the storage system. |
12 | ALM LED |
Red: Power supply unit can be replaced. |
13 | AC IN LED |
Green: Normal operation. |
14 | RDY1 LED |
Green: Normal operation. |
15 | RDY2 LED |
Green: Normal operation. |
AC power supply unit LEDs and connectors
SFF drive trays are equipped with AC power supply units. The AC power supply units include LEDs to display their operating status.
Number | Item | Description |
1 | RDY2 LED |
Green: Normal operation. |
2 | RDY1 LED |
Green: Normal operation. |
3 | Receptacle |
Connects to the power cable provided with the storage system. |
4 | AC IN LED |
Green: Normal operation. |
5 | ALM LED |
Red: Power supply unit can be replaced. |
Large-form-factor drive tray (DBL)
The following table describes the physical specifications of the large-form-factor (LFF) drive tray.
Name |
Model name |
Height |
Number of drive slots |
Drive type |
DBL |
DW-F1000-DBL |
2U (88.2 mm) |
12 |
3.5 inch (LFF) |
DBLE |
DW-F1000-DBLE |
2U (88.2 mm) |
12 |
3.5 inch (LFF) |
LFF front panel with bezel
Number | Item | Description |
1 | POWER LED |
Green: Drive tray is powered on. |
2 | READY LED |
Green: Drive tray is operational. |
3 | Locate LED |
Amber:
|
4 | Lock |
Locks and unlocks the front panel bezel by using the supplied key. |
LFF front panel without bezel
Number | Item | Description |
1 |
POWER, READY, and LOCATE LEDs |
Green: Drive tray is powered on. |
Green: Drive tray is operational. | ||
Amber:
| ||
2 | ACT LED |
Green: Normal operation. Blink green: Drive is being accessed. |
3 |
ALM LED | Red: Drive stopped due to a failure and can be replaced. |
4 | Large-form-factor drives |
The twelve 3.5-inch LFF drives are positioned horizontally. The slots are organized in the following order: 8 9 10 11 4 5 6 7 0 1 2 3 |
LFF rear panel
Number | Item | Description |
1 | ENC | N/A |
2 | POWER LED |
Green: ENC is in the power-on state. |
3 | Locate LED |
Amber:
|
4 | ALARM LED |
Red: ENC can be replaced. |
5 | PATH (IN) LED |
Blue: IN side port is linked up. |
6 | PATH (IN) connector |
Connects to a controller or drive tray. |
7 | PATH (OUT) LED |
Blue: OUT side port is linked up. |
8 | PATH (OUT) connector |
Connects to a drive tray. |
9 | Console |
This port is reserved. |
10 | Power supply unit | N/A |
11 | Receptacle |
Connects to the power cable provided with the storage system. |
12 | AC IN LED |
Green: Normal operation. |
13 | ALM LED |
Red: Power supply unit can be replaced. |
14 | RDY LED |
Green: Normal operation. |
AC power supply unit LEDs and connectors
Both SFF and LFF drive trays are equipped with AC power supply units. The AC power supply units include LEDs to display their operating status.
Number | Item | Description |
1 | RDY LED |
Green: Normal operation. |
2 | ACI IN LED |
Green: AC input is operating normally. |
3 | ALM LED |
Red: Power supply unit can be replaced. |
High-density intermix drive tray (DB60)
The following table describes the physical specifications of the high-density drive tray.
Name |
Model name |
Height |
Number of drive slots |
Drive type |
DB60 |
DW-F1000-DB60 |
4U (176 mm) |
60 |
3.5 inch (LFF) |
DB60E |
DW-F1000-DB60E |
4U (176 mm) |
60 |
3.5 inch (LFF) |
Dense intermix drive tray front panel with bezel
Number | Item | Description |
1 | POWER LED |
Green: Drive tray is powered on. |
2 | READY LED |
Green: Drive tray is operational. |
3 | Locate LED |
Amber:
|
4 | Lock |
Locks and unlocks the front panel bezel by using the supplied key. |
Dense intermix drive tray display LEDs
Number | Item | Description |
1 |
ACT |
Green: Normal operation. Blink: Drive is being accessed. |
2 | ALM LED |
Red: Drive stopped due to a failure and can be replaced. |
- Rear of drive tray: 48-59
- 36-47
- 24-35
- 12-23
- Front of drive tray: 00-11
Dense intermix drive tray rear panel
Number | Item | Description |
1 | Power supply unit | N/A |
2 | RDY LED |
Green: Normal operation. |
3 | AC IN LED |
Green: Normal operation. |
4 | ALM LED |
Red: Power supply unit can be replaced. |
5 | Receptacle |
Connects to the power cable provided with the storage system. |
6 | ENC | N/A |
7 | PATH (OUT) LED |
Blue: OUT side port is linked up. |
8 | PATH (OUT) connector |
Connects to a drive tray. |
9 | PATH (IN) LED |
Blue: IN side port is linked up. |
10 | PATH (IN) connector |
Connects to a controller or drive tray. |
11 | Console | This port is reserved. |
12 | ALARM LED |
Red: ENC can be replaced. |
13 | Locate LED |
Amber:
|
14 | POWER LED |
Green: ENC is in the power-on state. |
Rack support
The storage system can be installed in the Hitachi Universal V3 Rack, Universal V2B Rack, or Universal V2 Rack as well as non-Hitachi 19-inch racks that meet the storage system's specifications.
Non-Hitachi racks must be 4-post, EIA 310-D compliant with adequate airflow and weight capacity. The PDUs must be mounted properly to avoid any issues for servicing the storage system. The PDU receptacles must face toward the back (not toward each other). The area behind the storage system and between the vertical 19-inch mounting posts must be free of PDUs and cable loops.